  1. structural steel post and beam construction - allows more flexibility in design
  2. steel stud walls are put in place, and electrical wiring is roughed in
  3. interior wall finish is installed, acoustical ceiling grid is put in place, and ceiling tiles are preinstalled at the plant
  4. sprayed in place icynene insulation is an environmentally friendly product that seals the under-floor area completely
  5. flashing and trim details at the hvac unit
  6. structural steel roof beams and acoustical deck
  7. tyvek is applied as the wind barrier at the final layer of the building envelope before the siding is installed
  8. densglas gold exterior sheathing is water resistant
  9. architectural aluminum panels are fabricated by nrb and presintalled at the plant
  10. all flashings are carefully applied, and openings sealed between cladding systems, windows and doors
  11. building modules are fabricated in a "static" condition rather than on an assembly line, so we can be sure of precise fit and finish and so we can test all systems
  12. smartspace component on flatbed truck for delivery
  13. smartspace removed from truck
  14. smartspace installed at site
  15. smartspace in location ready for final touches
  16. smartspace ready for occupancy